Contingency fund calculator for Quebec condo boards
Estimate in 2 minutes the monthly contribution per unit needed to comply with Act 16. Free detailed PDF report sent by email.
This is an indicative estimate and does not replace an Act 16 compliant actuarial study. For compliance, mandate a member of OIQ (engineer), OAQ (architect) or OTPQ (professional technologist).
How it works
A transparent calculation based on Quebec actuarial practices and BNQ cost ranges. Method shown in the PDF report.
Describe your building
Construction year, unit count, type, general state, elevator, facade.
Run the calculation
For each component (roof, facade, HVAC, etc.), we evaluate replacement cost and remaining useful life.
Receive the report
Detailed PDF arrives in your inbox within minutes: per-component table, 25-year projection, methodology.